Michael Petruccelli says; Framing & securing the structure – Insist that
the lag bolts securely anchor the deck ledger beam to the framing of the house.
Make sure that the interface detail between the deck and the band joist is also
flashed with metal or waterproof membrane to prevent water intrusion into the
building.